Hanoi proposes tolls on Ring Road No.4
Tolls for the entire 113 km of Ring Road No.4, scheduled to be operational by 2027, would range from VND214,000 to VND815,000 ($8.81-$33.54).
Tolls for the entire 113 km of Ring Road No.4, scheduled to be operational by 2027, would range from VND214,000 to VND815,000 ($8.81-$33.54).